Concrete pier parallel to the channel, 200 m long, two mooring dolphins separated 30 metres each from pier; connected to shore via one 90 m causeway allowing vessels of up to 235 m LOA with a loading arm receiving the bulk urea via belts from the storage areas,load rate 1250 TPH. About halfway along the wharf there is a retractable loading arm for liquid ammonium. Silo capacity: 75.000 tons. Tanks: 30.000 cbm (See notes on Restrictions and Tugs).