Loading
Center map
Traffic
Bicycling
Transit

Made of reinforced concrete, this new pier has its frontage parallel to the channel between Ing. White and Galván, especially designed for container and general cargo, it is 270 m long and 40 m wide, with an outlying mooring dolphin at 50 m eastbound, depth alongside 13,90 m at datum. One mobile 4th generation Gottwald 100 ton crane plus various reach stackers and forklifts for container operations; 360 reefer plugs at contiguous container yard. Will be provided with container gantry crane (post-Panamax) running on rail to be laid at pier.